The BCP should contain a detailed specification of the main IT business processing systems and network configurations. For larger organisations with complex IT systems it may be appropriate to locate these specifications in an appendix to the main document. In the event that the detailed specifications are particularly lengthy, include in this section of the BCP a graphical representation of the critical system components together with a list of the key IT system components. This list should include the key business processes that are dependent upon each critical system component.
It is important that the system specification and representative diagrams are accurate and that they are updated if they are not currently fully up to date. It is also important that these specification documents are updated each time the IT systems are modified.
The following format is suggested for Hardware:
|
TYPE |
CPU/PC MODEL |
NO. |
PROCESSOR |
RAM |
DISKS |
VENDOR |
OPERATING SYSTEM |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Example 1 Server |
Pentium 3 |
2 |
1500 Mhz |
128 Mb |
12 Gb |
Compaq |
NT |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Example 2 Workstation |
Pentium 3 |
28 |
450 Mhz |
64 Mb |
1.2 Gb |
Compaq |
NT |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The following format is suggested for Software systems:
|
SYSTEM |
VERSION |
VENDOR/SUPPORT |
PLATFORM |
MAIN FEATURES |
KEY BUSINESS USERS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Example 1 Opics |
3.0 |
Misys |
IBM RS/6000 AIX |
Retail banking and Back office support system |
Retail branches and retail back office |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Example 2 Diameter |
2.4 |
Aran ltd. |
AS 400 OS/400 |
Foreign exchange |
Treasury and FX back office |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
(To complete the relevant section of the Business Continuity Plan, click here)
| Only US$199 |
|
This information is derived from the BCP Generator
For further information about the Business Continuity Plan Generator, visit |
|||
|
See also |
|||